Seismic isolation bearings are essential for protecting buildings in earthquake-prone areas. They work by decoupling the building structure from ground motion, reducing seismic forces and structural damage during earthquakes. Proper installation is critical to achieving optimal performance and compliance with safety standards.
Pre-Installation Preparation
Before installation, site surveys and foundation inspections are carried out to ensure the structural base meets design requirements. Bearings are selected based on building weight, seismic zone classification, and displacement capacity. Engineering drawings, load calculations, and compliance with standards such as EN 15129, AASHTO, and ISO 22762 are reviewed.
Installation Process
- Foundation Preparation: Ensure the base surfaces are level, clean, and capable of bearing the design load.
- Bearing Positioning: Place seismic isolation bearings—such as Lead Rubber Bearings (LRB) or Friction Pendulum Bearings (FPB)—in designated locations per the structural design plan.
- Alignment Verification: Check vertical and horizontal alignment to maintain performance under load.
- Fixing and Anchoring: Secure bearings to the foundation and superstructure using anchor bolts or embedded plates.
- Sealing and Protection: Apply corrosion-resistant coatings or protective covers, especially in coastal or industrial environments.
- Load Transfer: Gradually transfer the building load onto the bearings, monitoring for displacement or misalignment.
Product Parameters
- Types: LRB, FPB, HDRB
- Diameter Range: 300 mm – 2000 mm
- Vertical Load Capacity: 200 kN – 10,000 kN
- Horizontal Displacement: ±50 mm – ±600 mm
- Shear Modulus: 0.4 – 1.2 MPa
- Temperature Range: –40 °C to +60 °C
- Standards Compliance: EN 15129, AASHTO, ISO 22762
Post-Installation Inspection
After installation, engineers perform load tests, movement checks, and structural integration verification. Regular inspection schedules are set to monitor wear, corrosion, and performance over the building’s service life.
